Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Stiles Machinery - Holzma Production Work Cell

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
9,368
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Dec 24, 2009

This production cell uniquely demonstrates how software, machines, material handling and people interact. Designed to handle either short or long production runs, the final mix of products and batch sizes dictates the production results and the manpower needed. Constructing a mix of commercial case goods, this particular cell utilizes eight people, including one for assembly and one programming the Cut Rite software.
http://www.stilesmachinery.com/Default.aspx

Category:

Science & Technology

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (6)

Sign In or Sign Up now to post a comment!
  • • شركة قاضيكو للتجارة الدولية

    لدينا 14 صالة عرض بالقاهرة و الاسكندرية و طنطا و الرياض بمساحات عرض اجمالية اكثر من 10500 متر مربع نعرض بها احدث موديلات و تقنيات ماكينات و خطوط و خامات التعبئة و التغليف و التصنيع الغذائى و التصنيع الدوائى و تجهيزات المصانع كما يوجد لدينا اكبر تشكيل من ماكينات و خطوط التعبئة و التغليف الحديثة بضاعة حاضرة جديدة لتعبئة المواد المختلفة فى جميع اشكال و احجام العبوات موديلات و سرعات و احجام متعددة

    0172402677 002

    0123755628 002

    Sales2@kadyco.com

  • Two panels at a time in the panel saw balance the cell, no more than 200 panels/shift is possible 30 kitchens, but the boring machine drop this to 20 kitchens maximun/shift, is not bad, it can be increased if labeling is automated in any way, plus another edgebanding machine and in the boring phase using 2 or 3 new model BHX 050.

    I´m very glad to see this solution for the panel based furniture industry

    Ing. Gerardo Cicenia B.

    Venezuela

  • I like the concept, I use it in my facility, a front loading saw can process twice the edgebanding machine can do, and a CNC boring machine the half of pieces of the edgebander running at 20m/min.

    Two panels at a time in the panel saw balance the cell.....

    gerardo

    YV

  • The weeke BHX.. 30 seconds to process a piece, 4:40 to 5:10 even if can process 2 pieces in a mirror pattern it means 2,5 minutes to process a complete one door cabinet with a shelve, 24 cabinets/hour... 192 cabinets/8hour shift whit NON STOP!! ..like the promise at the end of the video of 140 cabinets per shift, this means 1000 pieces/shift but far to 3 to 5 thousand promised at the begining of the video.. 2.000 if all pieces are mirror type.

    Gerardo

    YV

  • Why the labeler discard all the printed labels at 1:48 minute, for video purpose only?

    from minute 2:13 is more real to try to label all of them....

    To finish whit the saw, this rear loaded machine is not the ideal one if you have to cut one or two panels of different color, the rear loading is for process at least half pack of panels, the time to load is critical.

    Gerardo

    YV

  • The concept showed is ideal for today demand of personalized furniture in a automated way.

    The version of the HPP 380 for more than one strip at a time in the cross cut, increase the efficience in this cutting phase, but we can clearly see that is impossible to the operator to identify by labeling all the pieces cutted, look at the printer at 1:34 minute... even with a normal machine this goal is hardly achived without let the saw wait for the labeler man, this is my experience

    Gerardo

    YV

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more