Upload

Loading icon Loading...

This video is unavailable.

June 15 construction update, K2 at K Station

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to like YoChicago's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to dislike YoChicago's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to add YoChicago's video to your playlist.

Published on Jun 18, 2012

http://K2Apts.com
http://YoChicago.com

Construction at the 34-story K2 at K Station high-rise is ahead of schedule after a mild winter.

On Friday, June 15, the tower crane "jumped" 100 feet in height, enabling it to haul materials up to the 26th floor. The crane was tied in at the 17th floor, which is complete.

McHugh Construction's Owen Smith showed me around the 3rd level deck, which will begin being tied into Halsted Street in about a week. We also took a brief look at a mockup unit that's being built at the owner's request for quality assurance purposes. Part of the unit is masked off pending pressure testing of the window systems.

Loading icon Loading...

Loading icon Loading...

Loading icon Loading...

The interactive transcript could not be loaded.

Loading icon Loading...

Loading icon Loading...

Ratings have been disabled for this video.
Rating is available when the video has been rented.
This feature is not available right now. Please try again later.

Loading icon Loading...

Loading...
Working...
to add this to Watch Later

Add to