Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

CAT 375 down deep

Loading...

Sign in or sign up now!
12,408
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Apr 21, 2008

CAT 375 excavator going down deep

  • likes, 4 dislikes

Link to this comment:

Share to:
see all

All Comments (7)

Sign In or Sign Up now to post a comment!
  • I hope theyre on by the hour because that is pathetic !

  • @tizer57 Even if the machine is too big, the contractor got the low bid and he's using the equipment he's got. Company I worked for did some jobs that would have been nice to have bigger machines than we had but the bid was for the smaller machines and we got the jobs done and still made a profit.

  • you are a tool. depth, reach and lift capacity are need to do sewer work. typically they are working at a depth of 20-40 feet below grade. thats why you need a typical yankee machine. and for your information the japanese make the biggest machine so shut your uninformed mouth!

  • long reach tick turd

  • Shut up. Its obviously needed to ''go deep''.

  • Is SoCal Earth Movers a union outfit?

Loading...
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more