Simpson's SW 900 has just left the roundhouse to perform the morning switch job by the waterfront in Shelton WA. The date is December 8th, 1995. The engine maneuvers to the back section of the mill to grab several log cars then sets them out on the log dump track. Some nice up close views of the 900 at work.
Link to this comment:
All Comments (0)