Upload

Loading icon Loading...

This video is unavailable.

SR 520 Bridge Pontoons: August 2012 Inspection and Repairs

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to like wsdot's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to dislike wsdot's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to add wsdot's video to your playlist.

Published on Sep 6, 2012

SR 520 pontoon inspection update on Lake Washington: August 2012

Crews are conducting routine inspections of the new pontoons on Lake Washington. During the inspections, crews found ballast water leaking between two cells in longitudinal Pontoon V. Repairs have been completed and excess water has been removed. The inspection also found moisture on the end wall of cross Pontoon W. The contractor will perform minor repairs as needed.

For more information, please visit our Web page: http://www.wsdot.wa.gov/Projects/SR52...

  • Category

  • License

    Standard YouTube License

Loading icon Loading...

Loading icon Loading...

Loading icon Loading...

Loading icon Loading...

Ratings have been disabled for this video.
Rating is available when the video has been rented.
This feature is not available right now. Please try again later.

Loading icon Loading...

Loading...
Working...
Sign in to add this to Watch Later

Add to