Here in St. P. City a railway bridge is getting demolished by three excavators and one wheel loader.
It happens because our station is getting redesigned and should look better after all the work is done.
The second part of the destruction is done during one long weekend and they are working for 24 hours a day in three shifts.
Heavy reinforced concrete that might be harder then expected.
Link to this comment:
All Comments (0)