In this stage accessories and protection equipments are assembled on the cover such as bushings, tap changer, conservator and buchhloz relay or pressure relief. The cover is fitted to the active part using bolts through the lifting angle. The terminals and leads of the coil are welded to the tap changer. Ratio test is done after finishing the assembly.
visit us at http://eps-technology.blogspot.com/
@subasin You are welcome
MrMuhammad2010 1 year ago
videos are very useful. Thank you MrMuhammad
subasin 1 year ago