THE WEIGHT OF THE MACHINE IS TOUGH ON THE OPERATOR, BUT THE RESULTS ARE EXCELLENT. ALL OF THE RED BLOTCHES ON THE HULL ARE EPOXY FILLERS AND WILL BE KNOCKED DOWN AS THE OPERATOR MOVES AFT. THE PORT SIDE OF THE YACHT IS BEING BOARDED BY HAND NEAR THE SHEAR-LINE. THE BOAT WILL BE IN THE PAINT SHOP FOR ABOUT A MONTH, HARD WORK TO SAY THE LEAST.
Link to this comment:
All Comments (0)