Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

CFD analysis of the car park ventilation system

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
3,609
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Oct 25, 2010

The car park consists of two levels, of which basement level B1 is investigated by means of CFD simulations. This basement is connected to the basements level B2 via several ramps.
The CFD model accounts for columns, beams, internal walls and other construction elements which can form an obstruction to the air flow.
The height of the car park is 3.35 m. As required by BS7346-7 reference, only one Basement Level has been modeled.

Abdelkader Benzamia
Head of Research & Developpment
flowpak
www.flowpak.net

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (1)

Sign In or Sign Up now to post a comment!
  • Is it approved by the client?

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more