The car park consists of two levels, of which basement level B1 is investigated by means of CFD simulations. This basement is connected to the basements level B2 via several ramps.
The CFD model accounts for columns, beams, internal walls and other construction elements which can form an obstruction to the air flow.
The height of the car park is 3.35 m. As required by BS7346-7 reference, only one Basement Level has been modeled.
Abdelkader Benzamia
Head of Research & Developpment
flowpak
www.flowpak.net
Is it approved by the client?
kzh6308 9 months ago