Tower installation part 2

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
12,130
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Mar 30, 2009

I dug holes 28" deep through soil and clay, then positioned concrete cylinders. Sequentially I then tapped each 3 foot long 3/4"-10 threaded dowel into the bottom of the hole surface in relation to each corresponding hole on the hinge plate. Once all threaded dowels were established, I poured quickcrete into each cylinder to the brim. I joined all four of the inner exposed concrete forms by digging a pit in the center and filling it too with concrete. After the concrete solidified, I mounted the hinge plate on the foundation. I actually screwed on some 3/4" nuts n each threaded dowel so that I could manually adjust the height of each corner should there be any mistake (inevitably there was). I placed the bottom tower section on the hinge plate and secured it with provided screws on the hinge brackets.

Category:

Science & Technology

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:

Video Responses

This video is a response to Tower pre-installation part 1
see all

All Comments (1)

Sign In or Sign Up now to post a comment!
  • I liked part two of your tower installation, looking forward to part three.

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more