U 4 Hafencity

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
23,739
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Feb 14, 2008

Großbohrpfahl und Schlitzwand für die Hamburger U-Bahn Linie 4 in der Hafencity
235040702

  • likes, 0 dislikes

Link to this comment:

Share to:

Video Responses

see all

All Comments (5)

Sign In or Sign Up now to post a comment!
  • We broke piles from Bauer with hydraulic cutter. Piles o1500 mm by E-On at the maasvlakte in Rotterdam.

  • do you have rigger to un lock the bucket, maybe it will be a lot more faster

  • in singapore theres alot of bore pilling here..what i mean is that the operator cant open fully the lock at the top of the kelly bar..he need two times to unlock it..The first one he makes a right turn..but the kelly bar didnt bounce back to unlock position and yet he will bring it up the kelly bar..The kelly drives and rope would get damage..

  • wannistelrooy why is this a amateur?

    I think you dosen´t have see this befor!

    Grüße an Siggi der im Hintergrund rumläuft ;)

  • amatuer operator..

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more