YouTube home Comedy Week on YouTube
Upload

ODOT Rebuilds Salt Creek Tunnel.

OregonDOT OregonDOT·213 videos
261
362 views
Like     Dislike 0

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to like OregonDOT's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to dislike OregonDOT's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to add OregonDOT's video to your playlist.

Published on Jun 26, 2012

In a major construction project, Oregon DOT is rebuilding a tunnel on Highway 58 outside of Oakridge to repair damage and increase capacity.

Loading icon Loading...

Loading icon Loading...

Loading icon Loading...

The interactive transcript could not be loaded.

Loading icon Loading...

Loading icon Loading...

Ratings have been disabled for this video.
Rating is available when the video has been rented.
This feature is not available right now. Please try again later.

All Comments (0)

Sign in now to post a comment!
  • Loading comment...
Loading...
Loading...
Working...
Sign in to add this to Watch Later