Murray Grove (Stadthaus) Construction Sequence 2008

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
25,521
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on May 11, 2009

This sequence of still images charts the construction of a pioneering building in Shoreditch, North London designed by Waugh Thistleton Architects. The entire erection of the nine storey structure was completed in nine weeks. The structure is fabricated entirely from cross-laminated timber panels, manufactured in Austria and assembled on site by KLH. The building comprises 29 residential apartments and was completed by Telford Homes in January 2009.

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (2)

Sign In or Sign Up now to post a comment!
  • mmm, no me parece muy sustentable, imaginen la cantidad de madera que se usaria para construir mucho edificios, la verdad no me parece sustentable

  • hahah, erection

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more