M74 Extension westbound: opening day 28/6/2011

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
2,440
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jun 28, 2011

Raw footage from my first turn on the M74 north-eastern extension, a few minutes after it opened (a little late) at 19:30 on Tuesday 28 June 2011. Heading eastbound from just west of the new junction at Tradeston and the Kingston Bridge as far as the Fullerton junction with the existing M74 stub. Sorry about the mobile phone interference.

The 8km motorway has cost an estimated £692,000,000, or about £90,000 per meter. It cuts through some of the poorest neighbourhoods in Glasgow, which (coincidentally) have some of the lowest levels of car ownership in the entire country.

Read my piece on the new motorway in Building Design (24 June 2011): http://www.bdonline.co.uk/news/analysis/urban-motorway-divides-glasgow/502041...

Category:

Autos & Vehicles

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

All Comments

Adding comments has been disabled for this video.
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more