Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Lean Manufacturing One Piece Flow

Loading...

Sign in or sign up now!
22,968
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jan 28, 2008

http://www.LeanManufacturingCoaching.com An animation showing the difference between "Batch and Queue" and "One Piece Flow"

Category:

Education

Tags:

License:

Standard YouTube License

  • likes, 1 dislikes

Link to this comment:

Share to:
see all

All Comments (5)

Sign In or Sign Up now to post a comment!
  • I was not talking about set up times, just that you have dedicated a machine to a task that requires it to wait on other machines to feed it one part at a time when it could be doing something else.

  • It depends on what you mean when you say "reconfigure". If you mean setting up a machine to run a different part, you're actually incorrect when it comes to most practical factory applications. That's where other lean tools like SMED assist in reducing setup times, making the changeovers less important.

  • If you constantly have a need to reconfigure machinery for different jobs then one piece flow ties up your machinery and batch and queue works better, if you always make the same product on a machine that is set up for one job only, then one piece flow works better.

  • Very good, it helps for my project.

    Thank you!!!!

Loading...
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more