Record 'High Load' reactor transported near Fort Mckay AB. This 19 storeys high Gas-Oil Pressure Reactor is making it's way to one of the oilsands sites. This is one of the largest move performed by Mammoet Canada, 62.15m high, 5.2m dia and 384 tonnes! 320 wheels. Slowly crossing the private bridge which is actual bending as it crosses over. Awsome site on this COLD Morning..even in -25 temp. (ref. Fort McMurray Today, Feb27)
*** ....you can hear steel bridge bending / flexing! *****
(Part 2 of my response) Then they design and build the vessel to these parameters. This vessel will have to withstand tremendous temperatures and pressures and to guarantee this, it is built in a special welding shop, likely in Edmonton and rigorously quality control tested at the same time
124dsa 2 months ago
The designers of these vessels make inquiries ahead of time with hauling contractors like Mammoet as to how big and heavy they can haul, and with the Department of Transport as to the loads that the structures are engineered for, or what has to be done to shore them up to allow the load to pass.
124dsa 2 months ago
i wonder why they didn't break it up first then take it across in pieces. Jobs for those on site. Plus looking at it, it feels like the bridge will collapse with the heavy weight which I know it won't
garycalgary 2 months ago