This is from a home in Crestview, Florida getting a WaterFurnace Geothermal system. This is the drilling part. You'll see them finish up the drilling so we're coming in about 90 minutes into this particular loop installation. Once the desired depth is reached, they pull out the stem and then install the geolink piping. Gets tough in a few spots. Not very exciting but I've had some requests as to "how does the drilling portion go?"