Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

PumpCrete Maple Leaf Square

Loading...

Sign in or sign up now!
3,145
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Nov 7, 2008

We pumped 2,400 cu. yds on a transfer slab on the 11th floor of the new Maple Leaf Square building in Toronto. To do this we set a 40 foot freestanding tower and placing boom on the floor below beside the slab and pumped to it with our 52 meter Schwing pump. I think it's another industry first for us. All this in 16 hours with a single Schwing pump

Category:

Education

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (3)

Sign In or Sign Up now to post a comment!
  • So is this thing specifically a Schwing pump because it stands alone, or is it the same thing on the truck that has the same pumps? The building being put up beside the Corus building on Queen's Quay East has their pump also built into the building. It's the first one I've seen, but I'm not in the industry. Seems like a very efficient way of doing all this.

  • ya i build the rebar on this job!!!

  • awesome job!!!!!!!! very very good

Loading...
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more