We pumped 2,400 cu. yds on a transfer slab on the 11th floor of the new Maple Leaf Square building in Toronto. To do this we set a 40 foot freestanding tower and placing boom on the floor below beside the slab and pumped to it with our 52 meter Schwing pump. I think it's another industry first for us. All this in 16 hours with a single Schwing pump
So is this thing specifically a Schwing pump because it stands alone, or is it the same thing on the truck that has the same pumps? The building being put up beside the Corus building on Queen's Quay East has their pump also built into the building. It's the first one I've seen, but I'm not in the industry. Seems like a very efficient way of doing all this.