Upload

Loading icon Loading...

This video is unavailable.

SR 520 Pontoon Float-Out, Oct. 2013

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to like wsdot's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to dislike wsdot's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to add wsdot's video to your playlist.

Published on Oct 5, 2013

Progress continues on the SR 520 Pontoon Construction Project, as the third cycle of new pontoons left the Aberdeen casting basin on a sunny Saturday morning, Oct. 5, 2013.

In the third cycle, crews built four longitudinal pontoons and two supplemental stability pontoons. The 360-foot-long longitudinal pontoons are the backbone of the new SR 520 floating bridge being built on Lake Washington and the supplemental pontoons provide additional stability and flotation. Crews will build a total of six cycles of new pontoons in Aberdeen.

For more information visit: www.wsdot.wa.gov/Projects/SR520/Pontoons

  • Category

  • License

    Standard YouTube License

Loading icon Loading...

Loading icon Loading...

Loading icon Loading...

Loading icon Loading...

Ratings have been disabled for this video.
Rating is available when the video has been rented.
This feature is not available right now. Please try again later.

Loading icon Loading...

Loading...
Working...
Sign in to add this to Watch Later

Add to