Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Advantage ICF Installation Video - Main Floor B Beam Pocket

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
1,144
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Sep 23, 2010

Advantage ICF Instructional installation video - Installing Main Floor (Part B).

This video covers the following: Foundation Section - Layout and First Row, Filler and Steel Placing Reinforcement, Second Course and Steel, Setting the Rest of the Block, Bracing with Wood, Top and Special Cuts, Pouring and Vibrating Concrete, Dowels and Taping.

Main Floor Section - Starting and Continuing, Beam Pocket, Finishing Off.

Second Floor Section - Continuing the Project, Top Course, Cutting top Block at Roof, Setting Walls Straight, Introduction to Metal Scaffolding, Attaching Framed Wall and Rafters, End Bulkheads, STC and Fire Rating.


You can learn more about Advantage ICF at http://www.advantageicf.com

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more