installed 3rd member - 4.56 gear ratio w/ Spool
driveline/u-joints in, all greased up and ready to break in!
Finished installing discs in rear, just got in the special order hydrolic lines, installing em today, as well as the coil wire, so I can relocate the coil further from the motor. when I races this rig, I had the coil mounted to the head where the power stering pump goes, but I now have power brakes that run on the pump, so I had to fabricate new brackets to install it so I wouldnt interfier with the water lines. Im hoping to fire it up this weekend!!
Link to this comment:
All Comments (0)