The 1st ever in this planet... no case study & anything is possible. Anyway ...wait for the 2011 flood (once in 40 years..previously 1931 & 1971). Anyone ready for it???? ..
i"m malaysian. representative of malaysia, i'm proudly invite people all over the world to visit malaysia. totally its not bad as us, uk, paris, german, korea, and others.
fairandjust, i hope you i can correct you that SMART was closed for 5 days once. for inspection of the cracks. and now, it is closed for 2 days if there is any flooding. and no doubt it works when there is no more flooding in the city centre, and the main idea of it is to end the flooding, NOT MAINLY to ease the traffic.
owh btw, in the inspection they found numerous cracks around the tunnel and have to fix it in time, this is due to heavy pressure while water was on the second level, but its not a big deal though coz they already fix the cracks. If there is more cracks then they have to close it for a long period of time again ( Just found out about this so i have to agree with mclenptp about the 5 day maintainence )
K.L> flooded
maxadful 1 month ago
I live in malaysia.i love going through this tunnel
amirasyraf25 1 month ago
The 1st ever in this planet... no case study & anything is possible. Anyway ...wait for the 2011 flood (once in 40 years..previously 1931 & 1971). Anyone ready for it???? ..
abracad6859 1 year ago
im using this tunnel everyday~ it cost me RM 2 to use this tunnel~
i enjoy it. cause i skip all those stupid traffic and horrible sun light
penny0102 1 year ago
wah,,hebat!! tapi bile la gaknye eh,,warga malaysia sendiri boleh bina struktur gitu..?? klu stkat jadi mando..mne2 negara pn boleyy..
leojacj 2 years ago
i"m malaysian. representative of malaysia, i'm proudly invite people all over the world to visit malaysia. totally its not bad as us, uk, paris, german, korea, and others.
corp24seven 2 years ago
as a malaysian,i am honored
edmundlancelot 3 years ago
1st in the world malaysia "smart" tunnel made by malaysia government. Do you think Malaysia government so smart?
haydonyang 3 years ago
fairandjust, i hope you i can correct you that SMART was closed for 5 days once. for inspection of the cracks. and now, it is closed for 2 days if there is any flooding. and no doubt it works when there is no more flooding in the city centre, and the main idea of it is to end the flooding, NOT MAINLY to ease the traffic.
alepbing 3 years ago
owh btw, in the inspection they found numerous cracks around the tunnel and have to fix it in time, this is due to heavy pressure while water was on the second level, but its not a big deal though coz they already fix the cracks. If there is more cracks then they have to close it for a long period of time again ( Just found out about this so i have to agree with mclenptp about the 5 day maintainence )
kucai222 3 years ago