Nov 2011: MV Lone's existing DP 1 system is upgraded to a DP 2 system. In dry-dock at the German shipyard Norderwerft, the vessel receives one additional 1,200 kW bowthruster, two retractable azimuths of 1,200 kW each and three 1,600 kW auxiliary engines to secure the power supply for the redundant dynamic positioning system.
Link to this comment:
All Comments (0)