U2 360° Tour The Claw / Stage Construction and Deconstruction (Stage build Time Lapse)
Uploader Comments (schnautzi)
Top Comments
-
It's like when i cook, 3 hours work, sometimes even more, n they eat in 15 min n hardly say thanks! :s
All Comments (144)
-
@gogzy, I spoke today with the tour's lighting designer. The slowest load out for the full package of sound, lights, and stage (not including the claw and false floor) was 15 hours from the first date, with the speed record being a little over 3 hours. The claw took another two days to get out after that.
-
Thank u
-
@alfombrodrb OMG, I used to work rigging in American Airlines Arena and now im a stay at home dad. I feel you.
-
only takes 4 days now to put up the stage..
-
it took 7 weeks to prep the site in moncton
-
The stage is to put Mick Jagger in his place........ LOL better than the big lemons or suspended car.
-
@JeffHardyRocks3000 lol. smart ass :)
-
@mustupac Why are you going through comments?? Tell me what you just want to correct everyone! smart ass
-
@JeffHardyRocks3000 you need to know hip hop is rap.an, rap is hip-hop so don't think their two different genres.
+200.000 viewers!
schnautzi 7 months ago 5
+100.000 viewers!
schnautzi 1 year ago 12