Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Dozer Action XI: Gassaway

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
45,066
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jan 22, 2008

It's not easy keeping the lights on.
Thanks to the guys from Pike Electric.
Gassaway, Tennessee job site.

http://brysonsdozerservice.blogspot.com/

http://dtccom.net/~rbryson/

Link to this comment:

Share to:
see all

All Comments (10)

Sign In or Sign Up now to post a comment!
  • @KodyThomas132 where at cuz there doin a bunch of work by my house

  • best!......happy watching!....

  • For a non union contractor like pike, their doing good to make it through a job with out loosing a guy....they dont give a shit about saftey its all about the bottom line

  • What would the point be to use a belt while climbing when he has a regular belt not a squeeze. Hitch hiking is gay.

    Do not take this video as how pike operates. I see at least 5 safety violations in the pike hand book this crew works way unsafe and should be wrote up by there GF

  • very good

    pike came down after gustav and they did some good work frestoring power they had the hardest workin crews

  • I free hand up poles.Whats wrong with that?Safer in my opinion.Its a mute piont now.Everyone has to use sqeezers now.

  • love the how the climer dose not use his belt till he at the top lol

  • just like pike not to use pipe when setting pole in energized primary.......

  • When did you video tape this

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more