Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Savannah River Site 105 P&R Reactor Exhaust Chimney Demolition - Controlled Demolition, Inc.

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
2,706
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Nov 23, 2010

Controlled Demolition, Inc. (CDI) of Phoenix, Maryland, USA (acting as Implosion Subcontractor to Baker Concrete Construction, Inc. of Monroe, Ohio) performs the successful explosives felling of two (2), 145 foot tall, reinforced concrete reactor chimneys, each sitting atop 55 foot tall reactor structures on Saturday, October 23, 2010 at the P and R Reactors within the Department of Energy's Savannah River Site in Aiken, South Carolina. http://www.controlled-demolition.com

  • likes, 10 dislikes

Link to this comment:

Share to:
see all

All Comments (2)

Sign In or Sign Up now to post a comment!
  • Looked like it was gonna hit that tree for a second.

  • I just love the work you do

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more