In this case it was fairly standard concrete/steel raft foundation, approx 2 weeks with associated ground & drainage works as it was a tricky site. It very much depends on the particular ground conditions and type of foundation specified how much time it takes.
The slab is already laid. Is that an additional day?
artdude102 7 months ago
In this case it was fairly standard concrete/steel raft foundation, approx 2 weeks with associated ground & drainage works as it was a tricky site. It very much depends on the particular ground conditions and type of foundation specified how much time it takes.
shamin39 7 months ago