Top Thrill Dragster
Uploader Comments (fenix691)
Top Comments
-
Before you say what you think you know, how about you make sure you're right.
Top Thrill Dragster was released 2 YEARS before Kingda Ka, and they were both built by the same company.
Besides, Top Thrill Dragster is better anyway, better theme, better view at the top, built first, and Kingda Ka is just a clone ride. Lame Six Flags!
-
nooo, Kingda Ka is a copy of Draster.
All Comments (30)
-
i went for the halloweekends it was my first hallo weekends cus i liv in chicago i go every year and my cousins got p passes and it was the most crowded day for him
-
No, Top Thrill Dragster was built 2 years before Kingda Ka. And Cedar Point was the first park to build a 2, 3, and 4 hundred foot coaster. Six flags just wanted the same thing, so THEY copied.
-
Nope, the other train doesn't sit on the launch pad, it sits behind the launch pad until the other train clears the top hat and hte brake fins go down. If you watch the brake fins go up behind the train, that's what would stop the train in case of a roll back.
-
what do they do if ther is a a rollback? WOuldnt the two cars hit each other if 1 was on the launch pad?
-
yeah the nature of the launch mech means there are often minor problems.
-
Erm sorry.... Kingda Ka Is the copy of top thrill draster....
-
its funny they waited 3 hours. i just got back yesterday from a whole weekend of cedar point. in the morning we rode maverick 3 times in 45 minutes and then went in the front seat 2 times in like 20 minutes. im tellin ya go in fall no ones ever there
y does it take so long 2 make it go
LoOoZzZeR39 3 years ago
it was the opening weekend for cedar point so top thrill wasn't working great. not sure if it was a new crew or whatever. but i was filming and my run was really fast, not sure why they were delayed for so long
fenix691 3 years ago
if it was the second train, then you have to wait for the first one to arrive at the unloading station. What they do is they have 6 trains. 2 of them go into the station, and are loaded. Once both of the trains are launched and cleared the brakes, the 2 trains come out, one to the launch pad, and one behind the launch pad. The first one is launched and the 2nd goes to the launch pad. But you have to wait for the 17 second ride, AND for the train to get into the unloading station. takes 20-40 sec
matters9319 3 years ago
Yeah this was the 2nd or 3rd car, however there was some weird 10 min delay, while they were still on the ride. i filmed it and it took like 40 secs for me. but for my friends that i filmed, it was 10 min, thats why i used the wipe to speed things along. still an awesome ride.
fenix691 3 years ago