Wolf Creek Dam noisy work quietly moves forward

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
4,735
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jun 8, 2011

JAMESTOWN, Ky., (May 31, 2011) - The U.S. Army Corps of Engineers Nashville District is set to resume work in Critical Area 1 here at Wolf Creek Dam. Critical Area 1 is the area where the earthen embankment wraps around the end of the concrete section of the dam.

Vertical holes will be drilled to define the edges of the cave and core trench along the alignment of the proposed concrete barrier wall. After testing, the holes will be gravity backfilled with grout to enable safe installation of the barrier wall.

The subcontractor is mobilizing equipment today into Critical Area 1 and should commence drilling tomorrow. As always, public safety is the top priority and the Corps of Engineers will be monitoring this and all other construction activities closely.

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (2)

Sign In or Sign Up now to post a comment!
  • Good vid !!

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more