Uploaded by ProModelSimulation on Jan 30, 2012
Cost Modeling: The cost of doing business can be broken down into fixed and variable costs. Fixed or overhead costs remain constant from period to period, regardless of the amount and type of entities processed or services provided. Examples of fixed cost include rent, utilities and salaries. Variable costs are costs that are only incurred when processing entities or providing services, the more entities produced or services provided, the greater the variable costs. It can be very useful to know what the average variable cost is for a given type of product or service. It can also be nice to know the average unit cost, which is the average variable cost per unit plus the average fixed cost per unit where the average fixed cost is calculated using activity-based costing allocation method.
Process Simulator allows the modeler to determine either average variable cost or average unit cost. Cost can be accrued that are either time based (e.g., time spent using a resource or undergoing an activity) or event based (e.g., they are incurred whenever an entity arrives or when a resource is used). Thus Process Simulator considers both time-based and event-based cost drivers. When building a model, cost can be assigned to arriving entities, to activity times, or to the duration or times that a particular resource is used. Additional costs can be added (or deducted) in any Logic Builder using the IncCost command. This gives you complete control over when and how much cost should be added during a simulation.
Situation: Increase the unit cost of an entity by some constant value each time a particular resource is used.
Example: A dental X-ray machine is used at a dentist office that has a fixed charge of $50 per use. We want to add this cost to the patient cost.
Solution: The cost per use for the X-ray machine is set to $50. Alternatively, we could have defined the X-ray as an activity and entered IncCost (Entity, 50) to increment the entity cost by $50.
If you are new to Process Simulator, you will first want to view our "Process Simulator Lite" Tutorial, available here: http://www.promodel.com/services/training/PCS/LiteTutorial/8.2/LiteTutorial.html
The model used for this example, as well as all of the modeling "how-to" examples, can be found in the ProModel Solutions Café (http://www.promodel.com/solutionscafe/howto/).
This video is part of our Process Simulator "How To" series, and is designed to accompany instructions available in our Process Simulator Help system. For more information, click here: http://www.promodel.com/onlinehelp/processsimulator/82/Process_Simulator_Help... and click on "Modeling How-Tos"
Category:
Tags:
- Costing
- Costs
- How To
- Process Simulator
- Visio
- predictive analytics
- ProModel
- discrete event
- simulation
- simulate
- process improvement
- tutorial
- Software
- Technology
- Software Tutorial
- How-to
License:
Standard YouTube License
-
0 likes, 0 dislikes
4:56
Visio 2007 Demo: Add and customize data graphicsby DemoTrainer12,340 views
2:17
Tracking Resource or Activity Time Costsby ProModelSimulation21 views
3:00
Prioritizing Resource Access for Two Different Entity Types at the Same Activityby ProModelSimulation29 views
4:29
Visio 2007 Demo: Connect data to your Visio diagramby DemoTrainer23,661 views
1:09
Assigning Raw Material Cost to an Entityby ProModelSimulation23 views
3:10
Waiting or Storage Costby ProModelSimulation29 views
3:20
Keeping a Resource through two or more activitiesby ProModelSimulation19 views
2:31
Using a Resource at an Activityby ProModelSimulation26 views
5:19
Processing Entity Batchesby ProModelSimulation28 views
2:37
Conveyance Kanbanby ProModelSimulation48 views
2:31
Accumulating Entities without Batchingby ProModelSimulation23 views
1:13
One Time Arrivalsby ProModelSimulation23 views
2:57
Percentage Based Solution A and Bby ProModelSimulation24 views
2:47
Arriving Entity Types are Randomly Distributedby ProModelSimulation42 views
3:19
Rejoining Created Entitiesby ProModelSimulation21 views
2:31
Entity-Based Activities Solution A and Bby ProModelSimulation27 views
2:43
Modeling Random Failuresby ProModelSimulation24 views
1:41
Sharing Resourcesby ProModelSimulation26 views
2:22
Disassembly Activities Solutionby ProModelSimulation25 views
2:53
Production Kanbanby ProModelSimulation52 views
- Loading more suggestions...
Link to this comment:
All Comments (0)