The Colne Valley Railway lunchtime pullman was combined with the service train on October 19th, with the two locos topping and tailing. The consist was; RSH 0-4-0ST 'Castle Donington No. 1', 2 x BR Mk1 coaches, 1 x Gresley coach, 2 x Pullman coaches, a generator van and BR class 08 0-6-0DE No. 08915
Link to this comment:
All Comments (0)