Loading...
Uploaded by ecotubesystem on Sep 30, 2010
Inspection of the third pass of a WTE boiler using a water cooled camera equipped with LED lights. Camera is looking up into the Super Heater. Film also shows a cleaning process by injecting water through a Soot Blower to remove deposists. Temperature approx 750 celcius.For more informationwww.ecomb.seKategori:
Science & Technology
Standard YouTube License
Load more suggestions
Link to this comment:
All Comments (0)