Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Jimmy Carter Blvd at Buford Highway CFI (Drive Through) - Gwinnett County, GA

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
121 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jul 15, 2011

Gresham, Smith and Partners (GS&P) developed this Continuous Flow Intersection (CFI) for Gwinnett Village Community Improvement District in Gwinnett County, Georgia. The project proposes to construct a two-legged continuous flow intersection (CFI) on SR 13/US 23/Buford Highway at the intersection with SR 140/Jimmy Carter Boulevard. The CFI would provide dual left turn lanes offset from the through lanes on the east and west legs of SR 13/US 23/Buford Highway so left turn movements could occur simultaneously with the mainline through.

The innovative design solution reduces congestion and delays and improves safety for all modes for a fraction of the overall costs of other design alternatives.

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more