LPV III New Orleans East - Deep Soil Mixing

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
1,009
Loading...
Alert icon
Sign in or sign up now!
Alert icon
Ratings have been disabled for this video.

Uploaded by on Mar 15, 2011

Treviicos South, a subsidiary of the Trevi Group (parent company of Soilmec), is working on a huge project to strengthen the foundation of 5.3 miles of earthen levee so the levee height can be increased from 17 feet to 28 feet. During construction, Treviicos used double-auger Soilmec SR-90 drill rigs and single-auger rotary rigs (a SR-70 and SR-80). Rigs are fitted with special attachments that mechanically break up the soil during drilling and mix it with injected cement grout.

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
  • Loading comment...
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more