East Garden Grove - Wintersburg Channel

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
179 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Sep 16, 2011

A 1:15 scale hydraulic physical model at approximately 150 feet in length has been constructed to evaluate the hydraulics of a portion of the complex East Garden Grove - Wintersburg Channel (CO5) flood control system located at the I-405 Freeway in Huntington Beach and Westminster (Orange County, California). The specific physical model program objectives are: (1) Evaluate performance at design discharge, (2) Determine maximum channel capacity, and (3) Improve channel performance

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (1)

Sign In or Sign Up now to post a comment!
  • Nice job!

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more