Our SIPs self build home rockets on. Two days to put up the first floor joists and deck out.
The first lift of scaffolding goes up and handrails are put around the stairs and gallery openings. In the background you can see the lorry arrive to deliver the last of the roof panels.
More details on our blog: http://lockfarm.blogspot.com
Link to this comment:
All Comments (0)