Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

How do you pave asphalt up to a concrete bridge deck?

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
3,645
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on May 28, 2009

Columbia Asphalt paving on I-90 near Ellensburg, WA. This video was shot May 20, 2009. It shows a paving operation approaching the end of a milled asphalt section and transitioning to a concrete bridge deck.

Category:

Education

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (3)

Sign In or Sign Up now to post a comment!
  • nice job leaving a ski jump to get on the bridge. There should've been a screwman on both sides to control the angle of attack as the tracks made contact with the bridge. As soon as the tow point starts to lift, start turning.

  • thats not the way to do it unless there was nothing else to pave on the other side of that joint and it was ur last joint

  • Yeah! piece of cake! and i dont need that slow piece of crap photocell joint matcher Oh by the way that job on I-90 in Ellensburg? paved that highway back in 1978, the states first recycled mix overlay, did'nt last a year! LOL they now know to add sand and aggregate to the millings. Love your video's Bro Pave it all.,

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more