Hauling away dried sediment removed from the Seaplane Lagoon that was contaminated with chemicals such as PCBs that entered the lagoon through the storm drain system. Hauling asphalt used for dewatering pad out to storage area for clean fill material on the wildlife refuge.
Link to this comment:
All Comments (0)