Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

The Asbestos Hot Water Boiler System / Asbestos Piping Removal Process

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
528 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jan 13, 2012

The Asbestos Hot Water Boiler System / Asbestos Piping Removal Process.
The asbestos is being removed from the piping and the piping will remain. This is a three-day process. Two full days for preparation and the 3rd day for removal with a hygienists monitoring the intake and the exhaust air from the basement professionally done meeting State and City requirements. I could not film the actual process. I did not have the contamination suit to go in there and I did not want to go in anyways. Here is a link to another asbestos job Similar to mine. http://www.youtube.com/watch?v=5f7medwuIMA
Leave Your Comments.

Category:

Education

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (2)

Sign In or Sign Up now to post a comment!
  • Lol lol lol lol lol lol lol!

  • Quite the project

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more