The Asbestos Hot Water Boiler System / Asbestos Piping Removal Process.
The asbestos is being removed from the piping and the piping will remain. This is a three-day process. Two full days for preparation and the 3rd day for removal with a hygienists monitoring the intake and the exhaust air from the basement professionally done meeting State and City requirements. I could not film the actual process. I did not have the contamination suit to go in there and I did not want to go in anyways. Here is a link to another asbestos job Similar to mine. http://www.youtube.com/watch?v=5f7medwuIMA
Leave Your Comments.
Lol lol lol lol lol lol lol!
Nepenthic4 3 weeks ago
Quite the project
Begbucks 1 month ago