Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Build a big ass Box day 4/5

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
148 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Mar 17, 2011

For day 4 I wasn't able to really capture anything. I was hoping to have had the box in my apartment and set up, then show a final project. Sadly it seems one of my past GFs was into Witchcraft and Hexed my ass Hard.

After painstakingly movin the 8 foot long, 4 foot wide, 32 inch tall box up the flight of stairs, Bribing additional hands by asking if they would do it for a Klondike Bar (Klondike Bar EARNED!!!), we discover the slight curve in the hallway of my Brilliant Apartment complex design has cockblocked us.

We attempted to saw the box in half and got half way through. Sadly the plug in skill saw, which took 4 F***ing hours to arrive we were using's blade heated up or dulled, or just wasn't getting the job done.

On the 5th day, today, I planned to bite the bullet, take a chain saw to it, then fix everything once it was in the house. Sadly the owner of the Chain saw got sick. GG just....GG.

I think something we can all take away from this is no matter how hot a gothish chick might be....if they say wicken, STAND DOWN!!!!

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more