Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

LOIS Webisode #3 - THE PIPE TAKES CENTER STAGE

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
1,123
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jul 26, 2010

The LOIS team has released the third webisode in its 5-part series on the Lake Oswego Interceptor Sewer.

The LOIS system will replace the interceptor sewer line, the backbone of the City's wastewater system, located in Oswego Lake. Replacement of the interceptor is critical to ensuring the environmental protection of Oswego Lake and maintaining sewer service for residents. The existing interceptor is undersized, resulting in overflows during heavy rains, and is vulnerable during an earthquake.

Category:

Education

Tags:

License:

Standard YouTube License

  • likes, 1 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more