German industry first began working on heavy tank designs in 1937. When the German Panzers in Russia encountered the Soviet T-34's and KV-1's in 1941 it was all too apparent that a new heavy tank was needed. Ultimately, this resulted in a specification for a 45-ton tank with an 88mm gun, heavy armor,
speed and manuverability. Production was ordered to start in August 1942. It began at a rate of 25 tanks per month and peaked in April 1944 at a rate of 104 per month. It took 300,000 man hours to build one Tiger, almost twice as much time as a Panther required.
Link to this comment:
All Comments (0)