The concrete has developed a plug coming up the drilled hole and has pushed most of the water out of the top of the opening. The top few feet of the plastic concrete has mixed with the water and has become watered down. This is near the end of the pour as the bad concrete and slurry of remaining water is pumped out.
Link to this comment:
All Comments (0)