Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Microsoft Canada | BC Hydro gets Connected with SharePoint 2010

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
298 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jul 9, 2010

BC Hydro built a new extranet for its Energy Mangers using Microsoft® SharePoint® 2010. The site is designed to help the group share ideas and exchange best practices.

Hydro is Canada's third-largest electrical utility, providing electricity to 94 per cent of the province's population. It's also recognized as a pioneer in the area of power conservation and generating energy in a socially responsible way. With thousands of employees spread across a massive area, one of the biggest challenges BC Hydro faces is ensuring that everyone has access to the same timely, accurate information no matter where they work. Working with Habaňero Consulting Group, BC Hydro built a new extranet for its Energy Mangers using Microsoft® SharePoint® 2010. The site is designed to help the group come together, share ideas and exchange best practices in real time, whether it's on a PC, browser or mobile device.

Find out how BC Hydro gets connected with SharePoint 2010:
http://www.microsoft.com/canada/casestudies/Case_Study_Detail.aspx?casestudyi...

Microsoft Canada Home:
http://www.microsoft.com/canada

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more