Pouring concrete

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
24,638
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Oct 28, 2007

This is how you pour and finish a 600 yard ramp deck in 5 hours.

Category:

News & Politics

Tags:

License:

Standard YouTube License

  • likes, 1 dislikes

Link to this comment:

Share to:

Uploader Comments (DCSTRO)

  • You guy are all Idiots. That slump was created by admixtures and not water. It's a .34 water cement ratio with over 700 pounds of cement including micro silica and a corrosion inhibitor. The concrete tested at 3500 psi in 24 hours and over 10000 in 28 days. The spray is a evaporation retardant. It will help hold in the moisture until the slab can be covered and cured.

see all

All Comments (22)

Sign In or Sign Up now to post a comment!
  • I'd kill my guys if I caught them brooming anything that wet. Ramp deck or not that is sloppy work.

  • How do u know if the right side is level with the form?

  • yuck

  • that slump is way more than a 4 try around a 6 if not more so- maybe super P and also- i would consider that broom job for agriculture pads so animals don't slip-

  • it still has to be chopped and frezzed

  • thats da nice thing about pourin ramp decks, bow float them damn things n broom em rough..... easy MONEY......

  • rough as guts..........................­......

  • what an ugly finish

  • what the fuc is this supposed to be a freeway or what ? pour and broom it huh fuck

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more