Fox River Papermill Smoke Stack Demolition

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
1,294
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on May 12, 2011

Fox River Paper Mill Demolition. Charles Jergens Construction of Dayton Ohio was the General Contractor and Subcontracted the Smoke Stack Demolition to St Louis Helicopter. 04/29/11 City of Urbana. I sped the video up 32 X's to make it a little easier to watch. The ball hanging from the helicopter weighs 2100 pounds

Link to this comment:

Share to:

Uploader Comments (DavidEHickey)

  • and how expensive was this like holy crap use a uhd or a high reach demo excavator

  • @caterpillard11r Wasn't really that expensive, not much room to get a crane in and the tower was 165' so to high for our high reach. I think it was like 7500.00 to fly in and for the first hour and 2500.00 every additional hour. Think it cost around 12,500.00 when it was all said and done.

see all

All Comments (4)

Sign In or Sign Up now to post a comment!
  • @DavidEHickey shoot i would have brought my sledge hammer and dimod it for $12,500!....... ha ha

  • Amazing!! Better than the run of the mill implosions we have seen so many of lately!!

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more