Parking Lots 800-858 SEAL (7325)

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
1,408
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jul 10, 2009

Asphalt Patching should be done between March 15th and December 15th with some flexibility pending the weather.
Asphalt Paving should be done between April 1st and November 31st.
Seal Coating should be done between April 1st and November 15th.
Striping should be done between March 15th and December 15th.
Crack sealing can be done 12 months a year as long as the pavement is dry.
Concrete work can be performed during the winter as long as the temperature is not expected to drop much below freezing during the first 24 hours. Under certain conditions, additives may added to deter the concrete from freezing.

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more