Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

* [LR] P3 Breaks Down , with P1 Shoving !!

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
6,241
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Nov 9, 2007

I took on a Phase 3 LRV on 022 at Stop 260 and after a turn it broke down at Stop 265 . The train crew tried to open and close the doors for many times and the Vehicle still couldn't accelerate .

The train crew then set down the pan and set on it once and tried to open and close the doors once again and the Vehicle still couldn't got start .

Finally a Phase 1 LRV which was on 006 got linked with the broken down Phase 3 LRV and shoved back to D01 , Depot . Phase 1 LRV 1040 replace the schedule of the broken down Vehicle .

輕鐵一列第 3 期列車發生機件故障,列車無法開動,車長多次開闢車門亦不能開車,其後重新升起集電弓,再重次開闢車門,但亦沒有作用。其後後隨的第 1 期列車興其連結,再把故障列車以明顯多於 15 km/h 的車速推回車廠。

Edited by Windows Movie Maker .
Canon S2 IS , 320x240 15" .
Gordon Graham , 11-09-2007 .

  • likes, 2 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more