I took on a Phase 3 LRV on 022 at Stop 260 and after a turn it broke down at Stop 265 . The train crew tried to open and close the doors for many times and the Vehicle still couldn't accelerate .
The train crew then set down the pan and set on it once and tried to open and close the doors once again and the Vehicle still couldn't got start .
Finally a Phase 1 LRV which was on 006 got linked with the broken down Phase 3 LRV and shoved back to D01 , Depot . Phase 1 LRV 1040 replace the schedule of the broken down Vehicle .
輕鐵一列第 3 期列車發生機件故障,列車無法開動,車長多次開闢車門亦不能開車,其後重新升起集電弓,再重次開闢車門,但亦沒有作用。其後後隨的第 1 期列車興其連結,再把故障列車以明顯多於 15 km/h 的車速推回車廠。
Edited by Windows Movie Maker .
Canon S2 IS , 320x240 15" .
Gordon Graham , 11-09-2007 .
Link to this comment:
All Comments (0)