Maxnet Ltd (Auckland, New Zealand) have designed and built a Tier III Plus, high density ready, Blade friendly and Green Data Centre. Utilising the APC by Schneider Electric Hot Aisle Containment System (HACS), combined with additional free cooling technologies, Maxnet have been able to maximise the energy efficiency and run the Data Centre at a PUE of 1.2, realising annual energy cost savings of up to 1 Million Dollars (NZ).
well i can say im with maxnet for christchurch, they are the best adsl provider by a long shot. Now if only they can reduce the excess gig charges of 2gig for $10 they would be perfect.