Loading of the bridge model made by Kranji Team 2 consisting of Yap Hong Yi Desmond (3A), Quek Hong Wei (3A), Ng Shao Hui (3B) and Tham Chin Siong (3B). The aim of the competition is to build the strongest and lightest bridge using bamboo skewers, some cardboard, limited glue and limited string.
The construction of the bridge was to be done on site at Ngee Ann Poly on 11 Sep 2009 and the duration was 6 hours.
Link to this comment:
All Comments (0)