Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Kranji Sec Team 2 (30 kg) - Ngee Ann Bridge Challenge 2009

Loading...

Sign in or sign up now!
468 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Sep 14, 2009

Loading of the bridge model made by Kranji Team 2 consisting of Yap Hong Yi Desmond (3A), Quek Hong Wei (3A), Ng Shao Hui (3B) and Tham Chin Siong (3B). The aim of the competition is to build the strongest and lightest bridge using bamboo skewers, some cardboard, limited glue and limited string.

The construction of the bridge was to be done on site at Ngee Ann Poly on 11 Sep 2009 and the duration was 6 hours.

Category:

Education

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more